Client: Edenstone Homes Brown field Development of 17 Homes
Price: 800k
Duration: 14 months
The former lime works in Itchington was a brown field development. The site required remediation throughout with the final finish needing an imported subsoil and topsoil capping layer. Excavated material was kept on site in a Landscaped bund to create a visual barrier to the motorway. The access lane was upgraded from a bridal way to an adopted highway with granite kerbs used to be in keeping with the surroundings. 17 plots were completed on site with Groundrich carrying out all aspects of the ground works to DPC level and hard landscaping throughout the site.